Roof Info Section

Location

Webster, NY

Roof Size

1,800 sq ft.

Project Duration

3 Business days

Materials Used:

 • Commercial-grade TPO membrane
 • EPDM for transitions and tight-access areas
 • Torch Down for perimeter and parapet reinforcement
 • Rigid insulation (polyiso)
 • Ice & Water Shield underlayment
 • 1/2” plywood replacement where needed

  • Client Request

    The client needed a full roof replacement due to ongoing leaks and deteriorated roofing materials.
    Key requirements were:
    — Maintain proper insulation and internal temperature (the building houses equipment and inventory)
    — Avoid disruption to business operations during installation

  • Scope of Work

    • Full removal of the old roofing system and substrate cleaning
     • Replacement of damaged plywood decking
     • Installation of tapered rigid insulation for proper drainage
     • TPO membrane installed as the primary roofing system
     • EPDM used for complex areas and transitions
     • Torch Down applied on parapets and high-risk perimeter zones
     • Flashing and sealing of all penetrations, vents, and joints
     • Final water-tightness inspection and quality check

Client Feedback:

“The team delivered excellent quality on schedule. The roof held up perfectly during the first heavy rain. Very professional service — highly recommend!”

Before and After Comparison
Before Image After Image
Before
After

WARRANTY & STANDARDS

  • Workmanship Warranty: 10 years
  • Material Warranty: As per manufacturer specifications
  • Installed in full compliance with commercial standards from GAF, Mule-Hide, and Firestone
Warranty Stamp